03/06/2026
While the harbour rested, the journey behind the launch was already in motion.
Before the SW96 Fortissimo could reach the water, she first had to reach the right position. Loaded and transported through the quiet hours of the night, this abnormal move carried the responsibility of ensuring the vessel arrived safely and ready for the greatly anticipated launch that followed.
With abnormal transport, the road is only the visible part of the operation. A vessel like the SW96 Fortissimo has to be understood before it can be moved, from the way its weight is carried to the way it will travel through every turn, clearance and approach. That is where proper route planning, the correct trailer configuration and experienced guidance play a crucial part, not simply in moving a load, but in delivering the level of excellence our clients trust THH for.
The successful transport of the SW96 Fortissimo stands as a significant milestone for us, and we are proud to have played our part in the journey that made her launch possible.