06/08/2025
JASAAN PORT | AUGUST 2025
Smooth and successful operations for LCT CASPI 1 at Jasaan Port. β
Fully loaded and now en route to Dapa, Surigao, carrying bulk construction aggregates.
π¦ LOADED MATERIALS:
β’ Washed Sand β 900 CBM
β’ 3/4" Gravel β 500 CBM
βοΈ Load capacity fully maximized.
π·ββοΈ ONBOARD TEAM:
Great job to our crew β Fernando and Joshua β for overseeing the operations and ensuring everything went according to plan. πͺ
π STATUS: Proceeding with barging operations.
Another day, another mission accomplished.